On this page
Rail linehaul
Rail pricing can be provided through:
- contract,
- tariff,
- quote/price authority,
- published rate,
- interline arrangement.
Do not assume a universal per-mile formula.
Commodity, car type, lane, volume and competitive access matter.
Fuel surcharge
Many railroad prices apply a fuel surcharge under the carrier's published/contract program.
Check:
- whether included,
- index/formula,
- effective period.
Equipment
Possible equipment cost:
- private car lease,
- mileage/car hire arrangements,
- railroad equipment charge,
- specialty car,
- heavy-duty flatcar,
- idler car.
Switching
There may be:
- origin switching,
- destination switching,
- intermediate switching,
- short-line charges,
- intra-terminal switching.
Whether included depends on the price/routing.
Demurrage
STB defines demurrage as a charge when railcars are detained beyond specified free time for loading/unloading.
It serves:
- to compensate for detained equipment, and
- to encourage efficient use/distribution of railcars.
Practical questions:
- When did free time start?
- How much free time applies?
- Was car actually/constructively placed?
- When was it released?
- Which tariff/contract governs?
Private cars and storage
Private railcars can still create storage/demurrage or other charges depending on carrier rules and location.
Do not assume owning the car means unlimited free track space.
Accessorials
STB lists examples including:
- diverting shipment in transit,
- ordering a car and releasing empty,
- weighing a car,
- tendering another railroad's car without linehaul,
- special train service,
- additional switching,
- incomplete/incorrect shipping instructions.
Carrier tariffs define actual charges.
Dimensional/high-wide charges
May include:
- clearance study,
- special handling,
- special train,
- idlers,
- engineering,
- route-specific service.
Transload
Adds:
- truck dray,
- transfer labor/equipment,
- storage,
- handling,
- rail linehaul.
But it may still reduce total long-haul cost.
Damage/claims are not accessorials
Cargo claims are a separate commercial/legal process.
Do not net an operational charge against a claim unless agreed.
How to compare rail quotes
Ask:
Rate What lane/commodity/equipment does it cover?
Fuel Included or separate?
Equipment Who supplies car?
Switching Included?
Demurrage Tariff/free time?
Interline Is entire route priced?
Transload/dray Included or separate?
Special handling Included?
Billing transparency
STB adopted demurrage-billing requirements after shippers raised concerns that invoices lacked enough information to verify charges.
If an invoice is confusing, compare it with:
- placement/release events,
- applicable tariff/contract,
- car number,
- dates,
- free time.
Bottom line
Rail cost is:
linehaul + fuel + equipment + switching + car time + exceptions
Make the assumptions visible.
Related:
- Railcar order, spot, load, release and pull
- Waybills, tracking and interchange
- How to avoid rail freight delays
Comparing rail quotes?
Send the quotes and the lane details and we will help you line up what each one includes, so the comparison is between the same moves.
Request a Freight QuoteOfficial reference
- STB Demurrage & Accessorial Charges: https://www.stb.gov/reports-data/demurrage-accessorial-charges/
