The base drayage charge
This is the core truck movement between the port/rail facility and the delivery or pickup location.
The rate can reflect:
- mileage,
- local market,
- port/ramp,
- terminal difficulty,
- equipment,
- delivery requirements,
- time window.
But drayage has more operational dependencies than a simple point-to-point linehaul.
Fuel
Dray carriers may apply a fuel surcharge or build fuel into the rate.
Ask whether fuel is:
- included,
- a separate percentage,
- a separate per-mile amount,
- subject to a published index.
Do not assume two quotes use the same structure.
Chassis
Possible charges include:
- chassis rental/use,
- split chassis,
- tri-axle/special chassis,
- extra chassis days,
- chassis repositioning.
The container and chassis are separate assets.
Who supplies the chassis matters.
Pre-pull
A pre-pull means the container is retrieved before the final delivery appointment and staged at a secure yard.
Why do it?
- beat the last free day,
- secure the container while an appointment is available,
- avoid a terminal closure,
- position the box for an early delivery,
- manage warehouse scheduling.
A pre-pull normally adds a yard movement and often storage/chassis time, but can prevent larger demurrage exposure.
Yard storage
If the box sits at a dray carrier's yard, storage may be charged by day.
Confirm:
- rate,
- when the day begins,
- whether weekends count,
- chassis charges while staged,
- reefer power/genset charges if applicable.
Private yard storage is not the same thing as marine-terminal demurrage.
Driver waiting / detention
If the driver waits at:
- terminal,
- warehouse,
- customer facility,
- exam site,
there may be waiting-time/detention charges under the dray carrier's terms.
Do not confuse a dray carrier's driver-waiting charge with an ocean carrier's container detention charge. The same word can be used in different contexts.
Demurrage / terminal storage
The FMC describes demurrage as a charge connected to cargo exceeding free time on a marine terminal.
The exact charge, payer relationship, tariff/contract and free-time calculation depend on the carrier/terminal arrangement.
These charges can escalate daily.
The dray provider may quote the truck move without including future demurrage that has not yet accrued.
Container detention / per diem / equipment use
After the full import container leaves the terminal, the ocean carrier's container is still equipment that has to be returned.
Beyond applicable free time, equipment-use charges may accrue.
Terminology varies. “Per diem” is often used for daily equipment-use charges in intermodal practice.
Always identify who is charging, for what asset, and for which dates.
Port-specific programs
Some ports have their own programs/fees.
Example: the Los Angeles/Long Beach OffPeak program uses terminal appointments and a Traffic Mitigation Fee structure managed through PierPASS.
That fee changes over time and is port-specific.
Do not treat a Los Angeles fee as a universal drayage charge.
Toll and access costs
Local tolls, bridge tolls, congestion programs, clean-truck programs or facility charges can apply depending on location.
Overweight / permits
Heavy boxes can create:
- special chassis charges,
- permits,
- additional axles,
- route limitations,
- additional distance,
- scaling/rework,
- transload costs.
A “heavy container” needs a road-legal plan, not just a stronger truck.
Redelivery / dry run / rejected move
Extra charges may result when the truck cannot complete the planned transaction because:
- container is not released,
- terminal rejects transaction,
- appointment is missing,
- warehouse rejects delivery,
- cutoff/ERD is wrong,
- chassis/equipment issue,
- empty-return location changes.
Responsibility depends on the contract and cause.
Customs / exam-related costs
Government exam work can create:
- transfer drayage,
- CES movement,
- exam facility charges,
- storage,
- extra chassis days,
- additional handling.
CBP says an intensive exam can require physical transfer to a Centralized Examination Station and cargo cannot legally move without authorization.
Transload costs
If freight is stripped from the ocean container, charges can include:
- unloading,
- palletizing,
- labor,
- storage,
- domestic trailer,
- reloading,
- disposal/dunnage,
- special handling.
A better way to compare quotes
Compare the assumptions.
Ask:
Included
- linehaul,
- fuel,
- chassis,
- free waiting,
- tolls?
Not included
- demurrage,
- container detention/per diem,
- storage,
- exam,
- overweight permit,
- pre-pull,
- special chassis,
- redelivery?
The lowest base rate is not always the lowest total move.
Related:
- Demurrage vs detention vs per diem
- Chassis, pre-pulls and yard storage
- What information do you need for a drayage quote?
Want to know what a container move will actually cost?
Send the shipment details and we will separate the line haul from the charges that depend on the terminal, the chassis and the clock.