On this page
Live unload
The driver brings the container to the receiver and waits while it is unloaded.
Then the driver takes the empty away.
Best when
- receiver can unload promptly,
- unloading is predictable,
- equipment must be returned quickly,
- site cannot store container/chassis.
Watch
- driver free waiting time,
- detention rate after free time,
- dock availability,
- lumper/labor,
- appointment delays.
A “two-hour unload” should be a realistic operating expectation, not a guess.
Drop
The container/chassis is left at the customer's facility.
The dray carrier returns later to retrieve it.
Best when
- customer needs longer unloading window,
- site has room,
- equipment can remain,
- driver productivity benefits from not waiting.
Watch
- chassis/container equipment time,
- empty-return deadline,
- yard security,
- chassis availability,
- site capability,
- pickup scheduling.
A drop can make the warehouse easier while making the equipment clock harder.
Grounded drop
Some operations can ground the container using specialized equipment rather than leaving it on a chassis.
This requires the right facility/equipment and is not a standard capability everywhere.
Transload
Freight is unloaded from the ocean container at a warehouse/CFS/transload facility and moved into:
- domestic dry van,
- flatbed,
- warehouse storage,
- multiple outbound trucks,
- other distribution mode.
Why transload
- destination is far inland,
- ocean container needs quick return,
- overweight box needs cargo redistributed,
- freight needs palletization,
- multiple deliveries,
- customer cannot unload container,
- domestic trailer is more efficient for long haul.
Example: heavy 20-foot import
A dense 20-foot box may be difficult to move legally on a standard chassis to a distant consignee.
Possible plan:
- short legal dray from port to nearby transload,
- strip container,
- distribute weight into legal domestic equipment,
- return empty ocean container,
- run domestic freight inland.
That can be more practical than trying to permit the ocean container hundreds of miles.
Example: customer needs three days to unload
A live unload is a poor fit.
Options:
- drop container/chassis, if equipment terms permit,
- pre-pull/stage then drop,
- transload and deliver on domestic equipment.
The right answer depends on equipment/free time and site capability.
Questions to ask the consignee
- Dock or ground unload?
- Appointment?
- Hours?
- How long to unload?
- Can container/chassis remain?
- Secure parking?
- Forklift/crane needed?
- Can they handle floor-loaded freight?
- Weekend access?
- Who calls when empty?
Questions to ask the dray carrier
- Live free time?
- Waiting rate?
- Drop available?
- Chassis daily rate?
- Drop duration limits?
- Pre-pull yard?
- Storage rate?
- Transload capability?
- Empty return responsibility?
The empty-return clock matters
The delivery option is not complete until you know how the empty gets back.
A drop that creates two extra equipment days can cost more than a live unload with one hour of waiting.
Bottom line
Choose the delivery method based on the whole container cycle, not just the receiver's preference.
Related:
Deciding how to take delivery?
Send the receiving hours, the dock situation and the unload time and we will help you choose between a live unload, a drop and a transload.
Request a Freight Quote