Import dates
Vessel ETA
Expected vessel arrival.
It is a planning date, not a container pickup appointment.
Discharge
The container has been unloaded from the vessel.
Availability
The container is shown as available for pickup, subject to required releases/holds.
Last Free Day — LFD
The applicable last day before the relevant free-time charge begins.
Confirm whose LFD/free time you are looking at.
Appointment
Terminal time window for the truck transaction where required.
An appointment does not automatically clear customs or carrier holds.
Export dates
ERD — Earliest Receiving Date
The first planned date the terminal will accept the export container for the sailing.
Cutoff
The deadline for the container and/or required documentation to meet the intended sailing.
A container delivered too early can be rejected.
A container delivered too late can miss the vessel.
Appointments are terminal-specific
There is no single U.S. port appointment system.
At Los Angeles/Long Beach, PierPASS says each member terminal manages its own appointment system.
Its 2026 operating report states that appointments are required for full import containers under the OffPeak framework.
Other terminals and ports use different platforms and rules.
Always use the actual terminal's current instructions.
Why “wait until LFD” is dangerous
Appointment capacity is finite.
PierPASS has specifically cautioned truckers not to wait until the last free day because an appointment may not be available then.
Operationally, the plan should be:
available → verify releases → appointment as early as practical → pickup
not:
wait until free time is almost gone → try to find a slot
The three statuses you should never confuse
Vessel status
Where the ship/container is in the vessel cycle.
Release/availability status
Whether the container can legally/operationally leave.
Appointment status
Whether the terminal has allocated a truck transaction time.
You need all applicable pieces.
Import example
ETA: Monday Discharged: Tuesday Customs released: Wednesday Terminal available: Wednesday LFD: Friday Appointment: Thursday 19:00
That is a healthy sequence.
Now change one fact:
Appointment: none available until Monday
That immediately becomes an escalation item because the appointment date is past the stated LFD.
Document the appointment attempts and contact the appropriate terminal/carrier parties promptly.
Export example
ERD: Wednesday Cutoff: Friday 16:00 Shipper loads: Tuesday
Problem: the box is ready before the terminal receiving window.
A pre-loaded export box may now require yard storage/chassis time until ERD.
Better planning may change the empty pickup/loading date.
Other cutoffs
Depending on the move, there may also be:
- documentation cutoff,
- VGM cutoff,
- reefer cutoff,
- hazmat documentation cutoff,
- rail cutoff,
- terminal-specific receiving deadline.
Use the carrier/terminal booking instructions.
What FCC recommends tracking
For imports:
- ETA,
- discharge,
- Customs release,
- carrier release,
- availability,
- LFD,
- appointment,
- pickup,
- empty-return deadline/location.
For exports:
- booking,
- empty release,
- ERD,
- shipper load date,
- appointment,
- cutoff,
- in-gate,
- vessel departure.
Bottom line
Dates control drayage.
When the dates are organized in one place, the move becomes much easier to manage.
Related:
- How an import container moves from vessel to final delivery
- How export drayage works
- Demurrage vs detention vs per diem
Working against a cutoff?
Send the terminal, the container and the dates and we will help plan the pickup around the appointment window rather than hoping for one.
Request a Freight QuoteOfficial references
- PierPASS appointments: https://www.pierpass.org/appointments/
- PierPASS 2026 operational report: https://www.pierpass.org/wp-content/uploads/2026/03/PierPass-2025-Operational-Costs-and-Financial-Report.pdf
- Port of Virginia container-event fields: https://operations.portofvirginia.com/api-subscriptions/