STATE PERMIT GUIDE
Connecticut: plan the permit work.
Every field below says what FCC has verified against an official source and what it has not. A field marked Confirmation required is one FCC has not verified — it is not a requirement that does not exist, and it is never a zero.
- Issuing authority
- Connecticut Department of Transportation (CTDOT) OS/OW Permit Office
- Checked by FCC
- 11 of 22 fields verified, last on 2026-09-20
Dimensions & weight
- General loaded width
- 102 in
Read against the cited official page on 20 September 2026. Exceptions and permit conditions apply.
Verified 2026-09-20 · FAQ - General loaded height
- 162 in
Read against the cited official page on 20 September 2026. Exceptions and permit conditions apply.
Verified 2026-09-20 · FAQ - Configuration-specific length
- 45 ft general vehicle length; CTDOT FAQ also lists 53 ft trailers subject to kingpin condition.
Read against the cited official page on 20 September 2026. Exceptions and permit conditions apply.
Verified 2026-09-20 · FAQ - Gross combination weight
- CTDOT publishes configuration-specific legal weights; the FAQ lists 80,000 lb for a qualifying 5+ axle tractor-trailer/wheelbase configuration.
Read against the cited official page on 20 September 2026. Exceptions and permit conditions apply.
Verified 2026-09-20 · FAQ - Axle / bridge / tire limits
- Confirmation required
FCC has not verified this against an official source yet, so nothing is published. Confirm the requirement with the Connecticut issuing authority — a blank field is not a requirement that does not exist.
- Load overhang
- Confirmation required
FCC has not verified this against an official source yet, so nothing is published. Confirm the requirement with the Connecticut issuing authority — a blank field is not a requirement that does not exist.
Permits & costs
- Single-trip permit
- Oversize/Overweight Single Trip permit is available, primarily for indivisible loads.
Read against the cited official page on 20 September 2026. Exceptions and permit conditions apply.
Verified 2026-09-20 · Oversize Overweight Permits - Annual permit
- Period-based permit categories include annual divisible and annual indivisible permits.
Read against the cited official page on 20 September 2026. Exceptions and permit conditions apply.
Verified 2026-09-20 · Oversize Overweight Permits - Validity
- Single-trip permit is valid for one trip and return over a 3-day period.
Read against the cited official page on 20 September 2026. Exceptions and permit conditions apply.
Verified 2026-09-20 · Oversize Overweight Permits - Published lead time
- Confirmation required
FCC has not verified this against an official source yet, so nothing is published. Confirm the requirement with the Connecticut issuing authority — a blank field is not a requirement that does not exist.
- Special / superload review
- Confirmation required
FCC has not verified this against an official source yet, so nothing is published. Confirm the requirement with the Connecticut issuing authority — a blank field is not a requirement that does not exist.
- State permit fee
- Single-trip base fee $30 plus $12 electronic transmittal fee; engineering-analysis fee applies above 200,000 lb at $2 per each 1,000 lb over 200,000. Read against the cited official page on 20 September 2026. Exceptions and permit conditions apply.Verified 2026-09-20 · Oversize Overweight Permits
Escorts & markings
- Pilot cars / escorts
- Confirmation required
FCC has not verified this against an official source yet, so nothing is published. Confirm the requirement with the Connecticut issuing authority — a blank field is not a requirement that does not exist.
- Police escort
- Confirmation required
FCC has not verified this against an official source yet, so nothing is published. Confirm the requirement with the Connecticut issuing authority — a blank field is not a requirement that does not exist.
- Height pole
- Front pole car required for loads 14 ft 6 in high or greater.
Read against the cited official page on 20 September 2026. Exceptions and permit conditions apply.
Verified 2026-09-20 · FAQ - Signs / flags / lights
- Confirmation required
FCC has not verified this against an official source yet, so nothing is published. Confirm the requirement with the Connecticut issuing authority — a blank field is not a requirement that does not exist.
When and where to move
- Travel hours
- Confirmation required
FCC has not verified this against an official source yet, so nothing is published. Confirm the requirement with the Connecticut issuing authority — a blank field is not a requirement that does not exist.
- Weekend movement
- Weekend permits may be requested for loads up to 12 ft wide, 13 ft 6 in high, 80 ft long and 160,000 lb; Saturday/Sunday movement is daylight to noon.
Read against the cited official page on 20 September 2026. Exceptions and permit conditions apply.
Verified 2026-09-20 · Oversize Overweight Permits - Holiday movement
- CTDOT publishes a current annual holiday restriction schedule.
Read against the cited official page on 20 September 2026. Exceptions and permit conditions apply.
Verified 2026-09-20 · Oversize Overweight Permits - Seasonal restrictions
- Confirmation required
FCC has not verified this against an official source yet, so nothing is published. Confirm the requirement with the Connecticut issuing authority — a blank field is not a requirement that does not exist.
- Weather restrictions
- Confirmation required
FCC has not verified this against an official source yet, so nothing is published. Confirm the requirement with the Connecticut issuing authority — a blank field is not a requirement that does not exist.
- Local / toll jurisdictions
- Confirmation required
FCC has not verified this against an official source yet, so nothing is published. Confirm the requirement with the Connecticut issuing authority — a blank field is not a requirement that does not exist.
Requirements and fees can change. Final permits, routes and movement requirements are determined by the applicable issuing authorities. State permits may not cover local or toll roads.
Resource center
Plan the details
Ten guides, in the order the work happens.
04Start here
How to plan a multi-state oversize load
One route, several permits, and the order to get them in. It is the one that matters most from where you are.
Read the guide →