Freight Command Center

STATE PERMIT GUIDE

Massachusetts: plan the permit work.

Every field below says what FCC has verified against an official source and what it has not. A field marked Confirmation required is one FCC has not verified — it is not a requirement that does not exist, and it is never a zero.

Issuing authority
Massachusetts Department of Transportation (MassDOT) Highway Division
Checked by FCC
6 of 22 fields verified, last on 2026-09-20
Dimensions & weight
General loaded width
102 in

Read against the cited official page on 20 September 2026. Exceptions and permit conditions apply.

Verified 2026-09-20 · MassDOT commercial truck permits, height and weight limitations
General loaded height
Confirmation required

FCC has not verified this against an official source yet, so nothing is published. Confirm the requirement with the Massachusetts issuing authority — a blank field is not a requirement that does not exist.

Configuration-specific length
MassDOT summary lists 53 ft for semitrailer/trailer in tractor-trailer combination, with configuration-specific limits for other vehicle types.

Read against the cited official page on 20 September 2026. Exceptions and permit conditions apply.

Verified 2026-09-20 · MassDOT commercial truck permits, height and weight limitations
Gross combination weight
Confirmation required

FCC has not verified this against an official source yet, so nothing is published. Confirm the requirement with the Massachusetts issuing authority — a blank field is not a requirement that does not exist.

Axle / bridge / tire limits
Confirmation required

FCC has not verified this against an official source yet, so nothing is published. Confirm the requirement with the Massachusetts issuing authority — a blank field is not a requirement that does not exist.

Load overhang
Confirmation required

FCC has not verified this against an official source yet, so nothing is published. Confirm the requirement with the Massachusetts issuing authority — a blank field is not a requirement that does not exist.

Permits & costs
Single-trip permit
Confirmation required

FCC has not verified this against an official source yet, so nothing is published. Confirm the requirement with the Massachusetts issuing authority — a blank field is not a requirement that does not exist.

Annual permit
Confirmation required

FCC has not verified this against an official source yet, so nothing is published. Confirm the requirement with the Massachusetts issuing authority — a blank field is not a requirement that does not exist.

Validity
Confirmation required

FCC has not verified this against an official source yet, so nothing is published. Confirm the requirement with the Massachusetts issuing authority — a blank field is not a requirement that does not exist.

Published lead time
Confirmation required

FCC has not verified this against an official source yet, so nothing is published. Confirm the requirement with the Massachusetts issuing authority — a blank field is not a requirement that does not exist.

Special / superload review
Confirmation required

FCC has not verified this against an official source yet, so nothing is published. Confirm the requirement with the Massachusetts issuing authority — a blank field is not a requirement that does not exist.

State permit fee
700 CMR 8 fee table: irreducible-load permit $40 per trip / $400 annual; superload >130,000 lb with detailed engineering $300 single trip; reducible overweight fee $50 per 1,000 lb exceeding Federal Bridge Formula. This source refuses automated requests, so FCC could not re-read it. The value is from the 20 September 2026 research pass against the cited official page. Confirm with the issuing authority before relying on it for a movement.Verified 2026-09-20 · 700 CMR 8, permitting and transport of overdimensional loads
Escorts & markings
Pilot cars / escorts
Confirmation required

FCC has not verified this against an official source yet, so nothing is published. Confirm the requirement with the Massachusetts issuing authority — a blank field is not a requirement that does not exist.

Police escort
Confirmation required

FCC has not verified this against an official source yet, so nothing is published. Confirm the requirement with the Massachusetts issuing authority — a blank field is not a requirement that does not exist.

Height pole
Confirmation required

FCC has not verified this against an official source yet, so nothing is published. Confirm the requirement with the Massachusetts issuing authority — a blank field is not a requirement that does not exist.

Signs / flags / lights
Confirmation required

FCC has not verified this against an official source yet, so nothing is published. Confirm the requirement with the Massachusetts issuing authority — a blank field is not a requirement that does not exist.

When and where to move
Travel hours
Confirmation required

FCC has not verified this against an official source yet, so nothing is published. Confirm the requirement with the Massachusetts issuing authority — a blank field is not a requirement that does not exist.

Weekend movement
MassDOT summary allows State Highway travel Monday 12:01 a.m. to Saturday noon and Sunday 12:01 a.m. to noon, subject to permit/holiday conditions.

The cited page belongs to the state and was reached on 20 September 2026. It names what the state publishes rather than a figure FCC could compare, so confirm the detail with the issuing authority.

Verified 2026-09-20 · MassDOT commercial truck permits, height and weight limitations
Holiday movement
No movements on New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving, Christmas; additional noon-before/noon-after restrictions apply around certain holidays.

Read against the cited official page on 20 September 2026. Exceptions and permit conditions apply.

Verified 2026-09-20 · MassDOT commercial truck permits, height and weight limitations
Seasonal restrictions
Confirmation required

FCC has not verified this against an official source yet, so nothing is published. Confirm the requirement with the Massachusetts issuing authority — a blank field is not a requirement that does not exist.

Weather restrictions
700 CMR 8 prohibits movement under applicable permit conditions when large areas of hard-packed snow/ice are on the road or during a snowstorm.

This source refuses automated requests, so FCC could not re-read it. The value is from the 20 September 2026 research pass against the cited official page. Confirm with the issuing authority before relying on it for a movement.

Verified 2026-09-20 · 700 CMR 8, permitting and transport of overdimensional loads
Local / toll jurisdictions
Confirmation required

FCC has not verified this against an official source yet, so nothing is published. Confirm the requirement with the Massachusetts issuing authority — a blank field is not a requirement that does not exist.

Requirements and fees can change. Final permits, routes and movement requirements are determined by the applicable issuing authorities. State permits may not cover local or toll roads.