Plan an oversize move before the truck rolls.

Enter where the load starts, where it is going, and how it will actually move. FCC brings the route, state requirements, permit costs, escorts, restrictions and next steps into one plan.

Plan a move

Start Choose the state your load starts in.

Skip the map and use the panel
StartDestinationRoute stateReviewed guide

Click your start state on the map, then the state you deliver in. The same state twice is an in-state move.

Where it loads. A state on its own gives a general corridor.

Where it delivers. A state on its own gives a general corridor.

How exact is this corridor? State only — general corridor

  • State only General corridor. No mileage, because none has been measured.
  • City or ZIP Better route estimate, with planning mileage.
  • Exact address Best planning route available here.

A state on its own is enough to start. Give more and the corridor sharpens; nothing here is required.

However exact the ends are, this is a preliminary planning route: the issuing authority decides the permitted one.

Measure the load as it will actually move. These figures decide every threshold, escort and fee in your plan.

Four figures are required: loaded overall width, height, length and gross weight. Everything else is optional, or needed only for a particular calculation — each one says which.

The freight itself

Loaded truck & trailer, measured as it will move

Configuration, axles & divisibility

Road type and overhang decide published width, escort and permit rules in most of the reviewed states, so an overwidth load needs them too. Axle weights and spacing are what an overweight fee and a bridge check are worked out from. Divisibility decides whether a permit applies at all.

What this load triggers, state by state along the route.

Your cost summary and the steps to make this move happen appear here once the route and the load are in.

Planning route only. The final permitted route is determined by the issuing authority. Requirements and fees can change.

What a permitted move can cost beyond the state fee

Your plan prices the published state components and names what a state decides case by case. These are the other charges the move carries; we add no markup to them.

  • State permit fee, per stateEach state sets it. Single-trip and extended-period permits price differently, and the amount can depend on approved miles, weight over the limit or dimension brackets. Your plan shows the published components and marks what a state decides case by case.
  • Superload or special reviewAbove the limits a state lists, the amount is determined case by case, after review.
  • Pilot cars and escortsFront, rear and height-pole vehicles are separate roles, priced by the escort company. Each state sets when each one is required.
  • Police escortPriced by the agency that provides it, where the state or a local authority requires one.
  • Route survey, height-pole run or bridge analysisRequired by some authorities before a permit is issued, and billed by whoever performs it.
  • Utility coordination and line liftsBilled by the utility when the route needs a line raised or moved.
  • Local approvalsCounty, city, toll road, port and private property each have their own permission and their own fee.
  • Permit service or filing feeCharged when someone files the applications on your behalf.
  • Amendment or re-issueWhen the route, date or configuration changes after a permit is issued, the authority issues the change.
The eleven things to line up, in order
  1. Measure what will actually move: loaded overall length and width, and height from the road surface. Keep the freight measurements separate from the loaded configuration, and record who confirmed them.
  2. Get gross weight, axle weights, axle spacing and front and rear overhang. Note attachments, and anything removed for transport.
  3. Decide divisibility, and be ready to support it. Eligibility is the authority decision, not the shipper one.
  4. Fix the route end to end: the pickup gate, the local roads to the highway, the state highways, and the local roads to the delivery gate. List every state and local jurisdiction it touches.
  5. For each state, identify the permit class you need and the variables its fee uses.
  6. Confirm escorts separately: front, rear, height pole and police each have their own trigger.
  7. Confirm whether a route survey, bridge analysis or utility coordination is required before the permit can be issued.
  8. Check the travel window for your date in every route state: daylight, rush hour, weekend, holiday and seasonal restrictions, and the days around a holiday.
  9. Obtain the local, toll, port and private-access approvals, and record who is obtaining each one.
  10. Apply with enough lead time, then check the issued permit against the actual vehicle, configuration, dimensions, dates and authorized roads before dispatch.
  11. Keep one shipment record. Re-check the whole movement when anything material changes, and get amendments from the authority rather than editing a permit.

STATE PERMIT GUIDES

Browse a state guide

Reading a state here changes nothing in the planner above: no start, no destination, no route, no load, no cost. It opens the guide.

Alabama1 of 22 fields verified · last verified 2026-09-20Arizona8 of 22 fields verified · last verified 2026-09-20Arkansas2 of 22 fields verified · last verified 2026-09-20California8 of 22 fields verified · last verified 2026-09-20Colorado22 of 22 fields verified · last verified 2026-09-20Connecticut11 of 22 fields verified · last verified 2026-09-20Delaware5 of 22 fields verified · last verified 2026-09-20Florida4 of 22 fields verified · last verified 2026-09-20Georgia5 of 22 fields verified · last verified 2026-09-20Idaho0 of 22 fields verifiedIllinois8 of 22 fields verified · last verified 2026-09-19Indiana6 of 22 fields verified · last verified 2026-09-20Iowa13 of 22 fields verified · last verified 2026-09-19Kansas17 of 22 fields verified · last verified 2026-09-20Kentucky0 of 22 fields verifiedLouisiana5 of 22 fields verified · last verified 2026-09-20Maine7 of 22 fields verified · last verified 2026-09-20Maryland3 of 22 fields verified · last verified 2026-09-20Massachusetts6 of 22 fields verified · last verified 2026-09-20Michigan4 of 22 fields verified · last verified 2026-09-20Minnesota15 of 22 fields verified · last verified 2026-09-19Mississippi3 of 22 fields verified · last verified 2026-09-20Missouri21 of 22 fields verified · last verified 2026-09-20Montana7 of 22 fields verified · last verified 2026-09-19Nebraska8 of 22 fields verified · last verified 2026-09-19Nevada13 of 22 fields verified · last verified 2026-09-20New Hampshire0 of 22 fields verifiedNew Jersey3 of 22 fields verified · last verified 2026-09-20New Mexico1 of 22 fields verified · last verified 2026-09-20New York3 of 22 fields verified · last verified 2026-09-20North Carolina3 of 22 fields verified · last verified 2026-09-20North Dakota20 of 22 fields verified · last verified 2026-09-20Ohio2 of 22 fields verified · last verified 2026-09-20Oklahoma5 of 22 fields verified · last verified 2026-09-20Oregon8 of 22 fields verified · last verified 2026-09-20Pennsylvania3 of 22 fields verified · last verified 2026-09-20Rhode Island3 of 22 fields verified · last verified 2026-09-20South Carolina6 of 22 fields verified · last verified 2026-09-20South Dakota9 of 22 fields verified · last verified 2026-09-19Tennessee2 of 22 fields verified · last verified 2026-09-20Texas5 of 22 fields verified · last verified 2026-09-20Utah1 of 22 fields verified · last verified 2026-09-20Vermont4 of 22 fields verified · last verified 2026-09-20Virginia10 of 22 fields verified · last verified 2026-09-20Washington4 of 22 fields verified · last verified 2026-09-20West Virginia9 of 22 fields verified · last verified 2026-09-20Wisconsin7 of 22 fields verified · last verified 2026-09-19Wyoming13 of 22 fields verified · last verified 2026-09-19